$3.6 million Seafood Production Line Installation
Location: Brunswick, Georgia
Duration: 3 Months
Overview
Perry Construction Management led a $3.6 million construction effort at a major seafood operational facility in Brunswick, Georgia. The goal was to install a new production line dedicated to shrimp and fried fish. The project included the implementation of hot oil
systems, advanced packaging equipment, and a robotic palletizer—all while coordinating around active production operations to minimize disruption.

Scope of Work
- Installation of hot oil cooking and frying systems
- Integration of high-efficiency packaging equipment
- Robotic palletizer installation for automated product handling
- Coordination of construction in an active manufacturing environment
- Collaboration with engineering teams and system vendors
Results
The project was delivered on time and within budget, resulting in a fully functional, highcapacity seafood production line. The addition of robotic and automated systems significantly increased throughput, reduced manual labor needs, and improved overall operational efficiency. This production line now plays a critical role in the company’s seafood processing operations.