Massive Manufacturing Plant Expansion with Various Infrastructure Improvements

Location: Blue Anchor, New Jersey

Duration: Ongoing

Overview

Perry Construction Management is leading a $16 million brownfield expansion at a frozen waffle production facility in Blue Anchor, NJ. This complex infrastructure upgrade includes the addition of critical utilities and structural assets to support increased production capacity. PCM is coordinating all activities onsite, ensuring safe integration of new systems into the active manufacturing environment.

Scope of Work

  • Installation of water tower and storage tank
  • Construction of pump room with industrial-scale pump
  • Installation of fire protection sprinkler lines throughout the plant
  • Construction of a 40' x 40' x 30' electrical distribution center with switchgear, transformers, and control cabinets
  • Development of a new parking lot with extensive excavation and sitework

Results

The expansion is progressing on schedule and within budget, with no significant disruptions to plant operations. PCM’s detailed planning and coordination allowed complex systems—such as the new electrical distribution center and fire protection

network—to be integrated seamlessly. The improvements will significantly enhance operational efficiency, utility capacity, and site safety, positioning the plant for long-term growth.

June 11, 2025
Location: Austin, Indiana Duration: Completed in 6 Months
June 11, 2025
Location: Indianapolis, Indiana 
June 11, 2025
Location: Laurel, Maryland Duration: 4 Months
June 11, 2025
Location: Brunswick, Georgia Duration: 3 Months
June 11, 2025
Location: Tracy, California Duration: 1 Year
June 11, 2025
Location: Florence, Kentucky Duration: 16 Days
June 11, 2025
Location: Peterborough, Ontario Duration: 9 months
June 11, 2025
Location: Charlotte, North Carolina
June 11, 2025
Location: Cincinnati, Ohio Duration: 9 Months
More Posts