$12 million Transformative Infrastructure and Safety Upgrades at Top 100 F&B Manufacturing Company

Location: Kansas City, Missouri

Overview

Perry Construction Management executed over $12 million in facility upgrades at a 900,000-square-foot Kansas City plant. These initiatives modernized infrastructure, enhanced safety, and improved production efficiency. Key elements included chiller

replacements, fire suppression and combustion air upgrades, and a phased reconstruction of the 5th-floor proofing room—all performed with minimal disruption to ongoing operations.

Scope of Work

  • Replacement of outdated chillers with energy-efficient models
  • Upgrades to the fire suppression system
  • Improvements to combustion air infrastructure
  • Two-phase reconstruction of the 5th-floor proofing room
  • Careful scheduling and execution to avoid production downtime

Results

The project delivered a safer, more efficient plant environment. New chillers improved cooling performance while reducing energy costs. Safety systems were brought up to modern standards, and the revamped proofing room provided a critical enhancement to snack production operations. PCM’s coordination and execution minimized disruptions and positioned the facility for long-term operational success.

June 11, 2025
Location: Austin, Indiana Duration: Completed in 6 Months
June 11, 2025
Location: Indianapolis, Indiana 
June 11, 2025
Location: Laurel, Maryland Duration: 4 Months
June 11, 2025
Location: Brunswick, Georgia Duration: 3 Months
June 11, 2025
Location: Tracy, California Duration: 1 Year
June 11, 2025
Location: Florence, Kentucky Duration: 16 Days
June 11, 2025
Location: Peterborough, Ontario Duration: 9 months
June 11, 2025
Location: Charlotte, North Carolina
June 11, 2025
Location: Blue Anchor, New Jersey Duration: Ongoing
More Posts