$177 million Phase Two Expansion

Location: Brownsville, Texas

Duration: Ongoing

Overview

Popular Food and Beverage manufacturer initiated the second phase of a $177 million expansion at their Brownsville, TX facility, aimed at transforming portions of existing frozen and dry warehouse space into modern production areas. The project includes the

construction of a new Line 6 and the reconfiguration of Line 4 to improve efficiency and boost capacity. Outdated infrastructure was demolished and replaced with upgraded production and storage areas designed to meet modern food safety and operational

standards.

Scope of Work

  • Demolition of outdated structures and construction of expanded production areas for Lines 4 and 6
  • Conversion of dry and frozen warehouse space into food production environments
  • Modernization of facility infrastructure to comply with food safety standards
  • Production optimization to support diverse product lines including cheese sticks, cheese bread, and fried shrimp

Results

The project significantly increased production capacity with the addition of Line 6 and upgrades to Line 4. Space utilization and operational efficiency were maximized through strategic warehouse conversions. The facility is now equipped to handle a wider variety of products with greater flexibility, all while meeting rigorous safety and compliance standards. 

June 11, 2025
Location: Austin, Indiana Duration: Completed in 6 Months
June 11, 2025
Location: Indianapolis, Indiana 
June 11, 2025
Location: Laurel, Maryland Duration: 4 Months
June 11, 2025
Location: Brunswick, Georgia Duration: 3 Months
June 11, 2025
Location: Tracy, California Duration: 1 Year
June 11, 2025
Location: Florence, Kentucky Duration: 16 Days
June 11, 2025
Location: Peterborough, Ontario Duration: 9 months
June 11, 2025
Location: Charlotte, North Carolina
June 11, 2025
Location: Blue Anchor, New Jersey Duration: Ongoing
More Posts